Grand opening for this customer located in Delta and we performed a multi phase rack installation, complete with some custom back mesh, guardrail and baby rack shelving. A fully integrated project consultation was needed to identify key operational requirements:
1.) Optimized pallet rack layouts
2.) Shelving requirements in different areas of the facility
3.) Racking safety equipment near pedestrian walkways and aisles
4.) Used shelving assembly and parts sourcing
Obstacles our team faced was re-installing partial used shelving that was supplied by the client. In the end, our skilled crew was able to work on researching similar lines and older pictures to properly assemble and install it with no other issues. Our Project Sales Consultant also managed the engineering process alongside our Account Manager to meet their pallet load requirements and permit submission requirements.